After the retention pond was dug and concrete pipe was laid, we had to run a pipeline from the street drain to the retention pond.
Soon after, we installed the parking lot drains and other related pipelines.


Randy Dollins (L) and Pastor Kelley (R) pump water from the parking lot.


Plastic pipe had to be laid from the front to the back of our property.


A look at our rain-soaked building pad.


Larry Dollins awaits a survey reading while placing a pipe.


Brian Dollins gives Engel Avalos a shoulder rub as he runs the compactor.


Parking lot drain installation nears completion.

Pastor Houston Kelley supervises the digging of a pipe trench.


After inspection, the pipe is covered with a layer of sand.


All pipelines are working, as the retention pond fills with water.


Chris Dollins (Front) helps clear a pipe trench for the parking lot drains.


A view from the north edge of the parking lot.


Drains are installed: parking lot ready to be graded.

Return To Building Project Pictures