![]() Randy Dollins (L) and Pastor Kelley (R) pump water from the parking lot. ![]() Plastic pipe had to be laid from the front to the back of our property. ![]() A look at our rain-soaked building pad. ![]() Larry Dollins awaits a survey reading while placing a pipe. ![]() Brian Dollins gives Engel Avalos a shoulder rub as he runs the compactor. ![]() Parking lot drain installation nears completion. |
![]() Pastor Houston Kelley supervises the digging of a pipe trench. ![]() After inspection, the pipe is covered with a layer of sand. ![]() All pipelines are working, as the retention pond fills with water. ![]() Chris Dollins (Front) helps clear a pipe trench for the parking lot drains. ![]() A view from the north edge of the parking lot. ![]() Drains are installed: parking lot ready to be graded. |
