One of the first off site jobs to be done was the installation of concrete pipe along the entire front of the property.
In all, we had to place over fourty (40) sections of pipe.


Jerry Dollins moving pipe with the "Dinosaur" fork-lift.


The backhoe was also used to swing the pipe into place.


Larry Dollins guiding the pipe into place.


Stan Rohrig and Bro. Randy (both Front) wait for the next section.

Bill Jordan digs the trench for the pipe.


Jimbo Dollins and Randy Dollins clearing loose dirt for the next pipe.


Bro. Randy gives the pipe a little extra push.


Maneuvering around the oak tree proved to be a tedious task.